Phoenix & Southwest CRE News In Your Inbox.
Sign up for Connect emails to stay informed with CRE stories that are 150 words or less.
Dermody Adding 1.2M SF to El Mirage Industrial Venture
Dermody will begin construction on Buildings 3 and 4 at LogistiCenter at Copperwing in El Mirage, Arizona, with delivery estimated for the third quarter of 2027.
Building 3 totals 693,760 square feet and Building 4 totals 520,170 SF. Together, the two buildings total 1,213,930 square feet and are designed to be combined into a single building totaling 1,319,962 SF. The buildings are located approximately 27 minutes from TSMC’s Phoenix-area campus and within an approved Foreign Trade Zone.
The news of the two new buildings follows Dermody’s full lease-up of Building 6 (284,421 square feet) at LogistiCenter at Copperwing, stabilizing the development’s first phase.
With Building 6 fully leased, Buildings 3 and 4 will represent the second phase of LogistiCenter at Copperwing, a 961-acre master-planned industrial park with capacity for more than 7 million square feet of distribution space. Dermody was represented by Pat Feeney, Dan Calihan, and Tyler Vowels of CBRE.
- ◦Development