Phoenix & Southwest CRE News In Your Inbox.
Sign up for Connect emails to stay informed with CRE stories that are 150 words or less.
Prefab Builder Begins Denver Multifamily Project
Mortenson and joint venture partner Pinnacle Partners started work on a prefabricated multifamily project in Denver’s Sun Valley neighborhood. When finished in 2024, the Revival on Platte development will be 234,156 square feet, feature 200 studio, one- and two-bedroom apartment options across eight stories and include two levels of parking. Amenities will include a gym, business center and rooftop deck.
Construction Dive reports the project is part of a $120 million, 4-project fund portfolio assembled by Pinnacle Partners, which also includes developments in Nashville, Tennessee; Austin, Texas; and Avondale, Arizona.
Mortenson will build the entire structure using the contractor’s cold-formed metal stud, steel-framed structural system with prefabricated interior and exterior walls.
The Minneapolis-based contractor will use BLUvera — a panel manufacturer and affiliate of Mortenson — to prefabricate the walls and exterior panels offsite. Once trucked in, Mortenson will place the pieces with cranes. The panels will include plug-ins for plumbing, HVAC and electrical equipment, which the contractor says will improve quality and reduce waste.
- ◦Development

