Texas CRE News In Your Inbox.
Sign up for Connect emails to stay informed with CRE stories that are 150 words or less.
Canadian Solar Building $250M Mesquite Manufacturing Plant
Canadian Solar is building a solar photovoltaic module manufacturing plant with an annual output of 5 GW, equivalent to approximately 20,000 high-power modules per day. The new facility represents an investment of over $250 million and will create approximately 1,500 skilled jobs once it is fully ramped up.
Production is expected to begin around the end of 2023. In 2021, Canadian Solar relocated Recurrent Energy, its 17-year-old U.S. subsidiary, to Austin, spearheading the rapid growth of renewable energy in the Texas as a solar and battery storage project developer.
Canadian Solar’s Shawn Qu added, “We hope that this is the first of many long-term investments we expect to make in the U.S. as we think strategically about a sustainable and resilient clean energy supply chain. We thank the State of Texas, Dallas County, and the City of Mesquite for their critical support and we look forward to working with them as we grow.”
- ◦Development