Texas CRE News In Your Inbox.
Sign up for Connect emails to stay informed with CRE stories that are 150 words or less.
Aledo ISD Elementary School Project Overcomes Challenges
Aledo ISD is nearing completion on a $36.5 million elementary school located on FM 5 just south of I-30 on the southwest side of the district. The 107,391-square-foot facility is a two-story split level which will house 800 students and includes a state-required storm shelter.
“With some of the challenges this project presented, the design and construction team on Annetta Elementary did an excellent job of problem solving to get this project to completion,” said Tyler Boswell, director of construction and facilities for Aledo ISD. “Annetta Elementary is a campus our community will be proud of, and we cannot wait to see the next generation of proud Bearcats enjoying this incredible building.”
The school will serve kindergarten through fifth grade and is the sixth elementary school in the district. The project features grade-level pods with collaborative learning spaces and an open library with reading nooks that overlook an interior outdoor learning hub.
Dunaway performed structural engineering services for the project.
- ◦Development